*The green highlighted items are being or have been completed as part of the Bond Issue or the Energy Conservation Project.
*The following lists are not necessarily in priority order. |
|
|
|
|
|
ARGENTINE ELEMENTARY FACILITY NEEDS LIST |
|
|
|
|
|
Eliminate portables New carpet/tile in classrooms New carpet library New carpet office space Ventilation A/C More meeting space More storage rooms/hallways/work areas Paint classrooms Wire portables for network capabilities Larger classrooms More electrical/computer/phone outlets and existing ones moved |
Remove chalkboards/hang white boards |
|
|
|
|
CENTRAL ELEMENTARY FACILITY NEEDS LIST |
|
|
Add water fountains Reinforce bookshelves More bathrooms Handicap bathrooms needed Brown water More meeting space Separate gym/cafeteria/multi-purpose room Permanent walls (Room 19 & 19B) Carpet classrooms More art room sinks Carpet art room, music room, & library User friendly plugs in classrooms Paint classroom walls Replace cafeteria tables Part art room, music room, & library Match desks/furniture in rooms Remove asbestos Make office area visitor friendly Wire portables Ceiling fans to move air |
Ventilation/AC/exhaust
systems Separate parking lot from sidewalk (fence, curb) Sewer renovation Networked computer/printer library Bus area unsafe Repair & paint curbs Fix cracked flooring/missing grout in walls Replace blackboards with white boards Absorbent runners/halls/music room Move clock in computer lab Playground upgrades Plant grass/soccer field Coat hooks moved/more classroom space Playground storage
Refinish cabinets/classroom doors (Rooms, hallways, grade level, library, & computer lab) Remove/replace
gymnasium flooring |
|
|
|
|
|
|
|
Ventilation A/C Replace/repaint ceiling tiles Eliminate portables Window cleaning/replacement/caulking New carpet Window blind replacement More bathrooms (student and faculty) New gymnasium floor Emergency exits Storage cabinets needed Replace cafeteria tables Need for locked storage in most rooms Remove freezers from gym Reinforce bookshelves Improve water filter system Media center storage Regulation of building heating system Physical education equipment Inadequate space for classroom storage Ventilation in all areas Student bathrooms handicap accessible Building air-conditioning Landscaping
|
Staff bathroom handicap accessible Update computers (classrooms and lab) Inadequate space for office storage Additional telephones Increase gymnasium Bus area pickup not safe Common keyed building/classrooms Parking area Front entrance handicap entrance ramp Cement repair on playground Ventilation system for gymnasium Curb repair Increase student bathroom facilities Fence repair Classroom window screens Parent pick-up/drop-off area insufficient Additional water fountains Playground upgrade/repair PA system updated Sidewalks repaired Paint throughout building Playground equipment storage Student desk replacement Update lighting throughout building |
|
|
|
|
Planning for the needs listed below will begin January 2005 |
|
|
Ventilation A/C Update Computers (Classrooms and Lab) Lockers Replaced and Area Enlarged Wire Portables for Network Capabilities Ventilation in all Areas Parking Areas Insufficient New Carpet Parent Pick-up/Drop off Area Insufficient Science Lab/Classrooms Needed Electrical Outlets Updated/Repaired PA system Updated Update Fire Alarms Paint throughout Building Sidewalks Replaced Replace/Repaint Ceiling Tiles Larger Cafeteria Cafeteria Storage |
Need for Locked Storage in Most Rooms Office Area Storage Eliminate Portables Physical Education Equipment All Outside Doors Replaced Signs Needed for Emergencies Separate Access for 7 Classrooms Formica Replacement in Classrooms Increase Student and Staff Bathroom Facilities Portables Handicap Accessible Make Student/Staff Bathrooms Handicap Accessible Separate Office Area Student Desk Replacement/Repair New Carpet Throughout Additional Telephone/Communication to and from Classrooms
|
|
|
|
|
|
|
|
Heating/Cooling updated |
Update handicap bathrooms |